SIGMA HYDROline PRO Installed in NEWWA Backflow Lab

SIGMA was proud to be chosen as the drainage supplier for the New England Waterworks Association’s new Backflow Lab Facility in Holliston, MA. The lab is used as a training and testing center, and as a result, can experience leaks and spills. Different types of harsh products, chemicals and cleaning agents are used in the facility, so an anti-corrosive and chemical resistant system was required. In addition, the floor space was quite shallow, so the design had to accommodate minimal depth while ensuring sufficient drainage.

HYDROline PRO was the perfect solution for this application. National Trench Drain Product Manager Todd Amerson explains, “The HYDROline PRO ideally met the needs of the NEWWA Backflow Lab Training Facility. It was a cost-effective, high-performance solution for this application.”

SIGMA extends a big thank you to Putnam Pipe for their diligence and generosity in coordinating the logistics and supplying the drainage system for this project.

For more information about this and other trench drain solutions, please contact tamerson@sigmaco.com or 609 286 8861.